When you go all the way to the frame, it can only improve after that. After looking at a blank canvas, now we can get to the good stuff.
It can only get better...
I went ahead and wrote scripture on the flooring.
We hope God blesses our little trailer and we have safe journeys.
Originally, as you can see around the edge of the floor, there are 2x2s with carriage bolts through them. What was the most difficult is that not only is it running through the 2x2 and the plywood flooring, it also had to run through a 2x4 on it's side and then into the frame. That made for a VERY long drill bit and a very long carriage bolt. It was a frustrating job.
Then, in hindsight, we should've put the flooring down before the 2x2's since it was very hard to cut the floor inside. It was like a big puzzle. We thought, "oh we can come put the floor in in 30 minutes or so". Yeah, no. It took 3 1/2 hours. But the results are fantastic!
Next step is getting the cabinets sanded and repaired and then putting the walls back up! With Christmas right around the corner, don't know how much we'll be able to work on it, but we've got a great start putting it back together.